<i id="7lrlr"><font id="7lrlr"><p id="7lrlr"></p></font></i>
<progress id="7lrlr"><meter id="7lrlr"></meter></progress>

    <track id="7lrlr"><span id="7lrlr"><th id="7lrlr"></th></span></track>

    <track id="7lrlr"></track>

        <span id="7lrlr"></span>
      <ins id="7lrlr"><listing id="7lrlr"></listing></ins>

      <ins id="7lrlr"><meter id="7lrlr"><output id="7lrlr"></output></meter></ins><thead id="7lrlr"></thead>

      <pre id="7lrlr"><pre id="7lrlr"></pre></pre>

      <address id="7lrlr"></address>

        <pre id="7lrlr"><sub id="7lrlr"></sub></pre>

      18703880862【Wechat】
      400-8850-626
      Home>Case>Stanley Zhumadian Suiping compound fertilizer project phase I and phase II

      Stanley Zhumadian Suiping compound fertilizer project phase I and phase II

      Author:administrators    Publish Time: 2020-07-09    Views:291


        Project Name: phase I and phase II of Suiping compound fertilizer project of Stanley group Zhumadian

        Type: single storey light steel structure workshop project

        Area: 120000 square meters

        Project introduction: the project is a compound fertilizer production project invested by Stanley group in Suiping County, Zhumadian. The civil engineering is undertaken by the seventh Engineering Bureau of China Construction Group, and the steel structure project is all undertaken by Henan Yuanda Steel Structure Engineering Co., Ltd. The project is divided into two phases. The first phase is composed of 5, 6, 7, 8, 9, 10 and roller workshops, and the second phase is composed of 1, 2, 3, 4 and 1 workshops and canteens. The project not only has large quantities and short construction period, but also has very high quality requirements. However, with the cooperation and efforts of our company, the project was finally completed on time and passed the acceptance. The project has been delivered to Party A for normal use.


      4p一女三男前后夹击小说_在线欧美精品一区二区三区_美女扒了内裤让男人桶_久久婷婷五月综合色d啪